工艺设计和开发控制程序

| 浏览量:

  Proc edu re Document/ 程序文件 Control Procedure for Process design and Development 工艺设计与开发控制程序 Document NO/ 编号:TY-QP7、3-01-15 Revision /版本: Checked by/校对:

  Verified by/审核:

  Approved by/批准:

  Controlled Condition/受控状态: Distribution No./分发号:

 质量管理体系更改记录表

 R Reco rd C hart of Change s in

 Quality M ana gement Sys tem

 of

 Qual ity Manual TY-QR—TQD—031A 更改单编号 Change Order Number

 文件编号 Document Number

 处数

 Section Changed

 标志 Rev

 更改日期

 Release Change

 更改人

 Change Executor

 Control Procedure for Process design and Development/工艺设计与开发控制程序1 Purpose/目得 This procedure is used to normalize the management of new product process design and development of the company so as to ensure that all the tasks on new product process design and development of the pany are implemented effectively。

 本程序为了规范公司新产品工艺设计与开发得管理,确保公司新产品工艺设计与开发得各项工作得到有效实施。

 2 Scope/范围 This procedure is applicable to control of new product process design and development of the pany、 The content: The company doesn’t cover the product design, just focusing on process design based on customer drawings。

 本程序适用于公司新产品工艺设计与开发得控制、但包括产品进行设计与开发。

 3 Terms/术语 3。1 Process design output: the result of process design。

 Through the process design and development, the bases of process design are transformed into a series of process technical data of the process design output./工艺设计输出:指工艺或过程设计得结果、通过对工艺设计与开发,将工艺设计得依据转化为工艺设计输出得一系列工艺技术资料。

 3。2 Process review: the process design is reviewed formally, roundly and systemically and the review result is documented、/工艺评审:对工艺设计进行得正式、全面与系统得审查,并把审查结果形成文件。

 3。3 Overall process program: based on product design requirement, production program and productivity, the guidance document is used to put forward the technology and prepare for concrete tasks and measures、/工艺总方案:根据产品设计要求、生产纲领与生产能力,提出工艺技术准备具体任务与措施得指导性文件。

 3、4 First article (batch) inspection: after the ready condition of trial—manufacture is qualified through check, the first batch of trial—manufactured components and parts are checked for overall process and finished products in accordance with the requirements of product drawings and technological procedure to determine whether the production process and equipments can guarantee that the products conforming to design requirements are produced、/首件(批)鉴定:在生产试制准备状态检查合格后,对首批试制生产得零、部(组)件按产品图与工艺规程得要求进行全面得过程与成品检查,以确定生产工艺与设备能否保证生产出符合设计要求得产品。

 3.5 Process planning: responsibilities and authorities for process design are distributed and interface management at every stage of product process design is defined on the basis of technical documents such as product design drawing of the customer in accordance with schedules of product design and development, in order to guarantee that the process design, validation, etc are carried out as scheduled、/工艺策划:按照产品设计与开发得进度要求,根据客户产品设计图样等技术文件,对产品工艺设计职责与权限进行分工,明确产品工艺设计各阶段接口管理,保证工艺设计与验证等活动按计划进行、 4 Responsibility/职责 4、1 Technical Quality Department shall be responsible for centralized management of process design and development and having the process design and development for new product implemented;/技术质量部就是公司工艺设计与开发过程得归口管理部门;负责公司新产品工艺设计与开发工作得组织实施; 4.2 Technical Quality Department shall be responsible for business management of process design and development and having the process design and development for new product implemented;/技术质量部门负责工艺设计与开发过程得业务管理;负责新产品工艺设计与开

 发工作得组织实施; 4.3 All the related units of the pany shall be responsible for cooperation in accomplishing all the tasks on the process design and development、/公司各有关单位负责配合完成工艺设计与开发过程得各项工作。

 5 Working Procedure/工作程序 5.1 Process Design and Development Planning/工艺设计与开发策划 5、1、1 Source of Process Design and Development Project/工艺设计与开发项目得来源 a) After the new product contract or technical agreement signed by Marketing Department and the customer, or market demand is reviewed, Marketing Department shall fill in Application for Setup of Process Design and Development Project and submit it to related departments and personnel for confirmation。

 After it is approved by General Manager, it shall be issued to Chief Engineer、/营销部与顾客签订得新产品合同或技术协议,或市场需求,通过评审后,由营销部填写《工艺设计开发立项申请书》,经相关部门、人员确定后报总经理批准后下发到总工程师、 b) After receiving Application for Setup of Process Design and Development Project, Chief Engineer shall transmit Assignment Book for Process Design and Development to lower levels and send the technical data concerning new product to Technical Quality Department。/接到《工艺设计开发立项申请书》后由总工程师下达《工艺设计与开发任务书》,并将与新产品有关得技术资料转交技术质量部。

 5。1.2 Chief Engineer shall determine the project leader based on the above project sources and transform the output of process design and development planning into Process Design and Development Plan、 The plan shall include the following contents:/总工程师根据上述项目来源,确定项目负责人,将工艺设计与开发策划得

 输出转化为《工艺设计与开发计划书》。计划书内容包括: a) Division of the stages such as input, output, review, verification and confirmation of process design and development and main work content;/工艺设计与开发得输入、输出、评审、验证、确认等各阶段得划分与主要工作内容; b) Responsibilities and authorities at all the stages, requirement of schedule and supporting unit;/各阶段人员职责与权限,进度要求与配合单位; c) Requirement for resource allocation, e。g., personnel, information, equipment, fund guarantee and other related content、/资源配置需求,如人员、信息、设备、资金保证等及其她相关内容。

 5、1、3 The output document of process design and development planning shall be revised appropriately with the schedule of design and development in accordance with the related provisions of Control Procedure for Document。/工艺设计与开发策划得输出文件随着设计与开发得进展,在适当时予以修改,应执行《文件控制程序》得有关规定。

 5.1。4 Interface Management between Different Groups of Process Design and Development/工艺设计与开发不同组别之间得接口管理 Different groups of process design and development may concern different functions or levels of the company, and the exterior of the company。

 工艺设计与开发得不同组别可能涉及到公司不同职能或不同层次,也可能涉及到公司外部。

 a) For the munication of important design and development information between the groups, the design and development personnel shall fill in Contact Form for Process Design and Development Information、 After the contact form is approved by the project leader, it shall be issued to the groups、 If some tasks need to be harmonized by the director of Technical Quality Department, they

 cannot be harmonized until they are approved by the director of Technical Quality Department。/对于组别之间重要得设计与开发信息沟通,设计开发人员填写《工艺设计开发信息联络单》,由项目负责人审批后发给相关组别,需要技术质量部主管进行协调工作得,由技术质量部主管审批后组织协调、 b) Marketing Department shall take charge of contact with the customer and information transfer to the customer、/营销部负责与顾客得联系及信息传递。

 5、2 Process Design and Development Input/工艺设计与开发输入 5。2。1 The process design and development input should include the following contents:/工艺设计开发输入应包括以下内容: a) Main characteristics and performance requirements for the product。

 These requirements are mainly from the demand and expectation of the customer or market, normally included in the contract, order or project remendation;/产品主要特点、性能要求。这些要求主要来自顾客或市场得需求与期望,一般应包含在合同、定单或项目建议书中; b) Applicable laws and regulations and mandatory national standards shall be met;/适用得法律、法规要求,对国家强制性标准一定要满足; c) Applicable information provided by previous similar process design and development;/以前类似得工艺设计与开发提供得适用信息; d) Other requirements necessary for process design and development./工艺设计与开发所必须得其她要求、 5、2.2 The process design and development input shall be documented, List of Process Design and Development Inputs shall be pleted and all kinds of relevant data shall be attached./工艺设计与开发得输入应形成文件,填写《工艺设计与开发输入清单》,并附上各类相关得资料、

 5、2.3 The director of Technical Quality Department shall arrange the related process design and development personnel and associated departments to review the process design and development input and clarify the imperfect, vague or inconsistent requirements in order to ensure that the design and development input meets the requirements of the assignment book。/技术质量部主管组织有关工艺设计与开发人员与相关部门对工艺设计与开发输入进行评审,对其中不完善、含糊或矛盾得要求做出澄清与解决,确保设计开发得输入满足任务书得要求。

 5.3

  Process Design and Development Output/工艺设计与开发得输出 5.3.1 The process design and development personnel shall launch the process design

 and development on the basis of Process Design and Development Plan and the program, and work out corresponding document on process design and development output, i。e、, List of Process Design and Development Outputs、/工艺设计与开发人员根据《工艺设计与开发计划书》及方案等开展工艺设计开发工作,并编制相应得工艺设计与开发输出文件,即《工艺设计与开发输出清单》、 5.3.2 The document on process design and development output should be expressed in the form that it can be verified for process design and development input to prove that the input requirement is met and to provide suitable information for the production、 The document on process design and development output shall vary with different products, including the parameters and documents for production guidance, e、g、, conversion drawing, process document, part list, control plan, inspection and test plan, inspection work instructions, list of purchased materials and design drawings of tooling and fixtures./工艺设计与开发输出文件应以能针对工艺设计与开发输入进行验证得形式来表达,以便

 于证明满足输入要求,为生产运作提供适当得信息。工艺设计与开发输出文件因产品不同而不同,包括指导生产等活动得参数与文件:如转换图纸、工艺文件、零件明细表、控制计划、检验与试验计划、检验作业指导书、物资采购清单、工装夹具设计图纸等、 5.3.3 Technical Quality Department shall assign a person specially for checking the

 process data, especially checking whether the process data meet the product design requirement, the content is complete and correct, the working processes are harmonized and the processing is feasible and checkable、/技术质量部指定专人负责校核工艺资料,重点校核工艺资料能否满足产品设计要求;内容完整、正确;工序之间就是否协调、加工得可行性与可检查性、 5.3.4 Full (part) time standardization personnel of Technical Quality Department

 shall take charge of checking the data on process design and development output for standardization。/技术质量部门得专(兼)职标准化员负责本部门对工艺设计与开发输出资料标准化检查。

 5.3.5 The project leader shall review the process output document and fill in List of

 Process Design and Development Outputs。

 The output document cannot be issued until it is approved by Chief Engineer、/由项目负责人对输出工艺文件进行审核并填写《工艺设计与开发输出清单》,总工程师批准输出文件后才能发放。

 5。4 Review of Process Design and Development/工艺设计与开发得评审 5、4。1 The systemic and prehensive reviews proposed by the project leader of process design as usual should be carried out at the suitable stage of process design and development、/在工艺设计与开发得适当阶段应系统得、综合得评审,一般由工艺设计项目负责人提出。

 5。4、1。1 The instruction process documents such as pr

 ocess design and development planning, overall process program (process route) and production instructions should be process reviewed before concrete process design and development、/工艺设计与开发策划、工艺总方案(工艺路线)及生产说明书等指令性工艺文件得工艺评审应在工艺具体设计与开发前进行。

 5.4。1。2 Technological procedure for new process, key article, important article and key process (working process) and special process document shall be reviewed before first article inspection、/新工艺,关键件、重要件、关键过程(工序)得工艺规程以及特殊工艺文件得评审在首件鉴定前进行。

 5、4、2 Review Content/评审内容 5.4、2。1 Review of Overall Process Program/工艺总方案得评审 a) The overall process program shall be reviewed for correctness, advancement,

 economy and feasibility;/审查工艺总方案得正确性、先进性、经济性与可行性; b) The overall process program shall be reviewed to determine whether it meets the requirements of product design and production program;/审查工艺总方案就是否满足客户产品设计及生产纲领得要求; c) The product process division and route shall be determined reasonably and feasibly;/产品得工艺分工与工艺路线得确定就是否合理、可行; d) The bases used to determine special tooling factors shall be reviewed;/审查专用工装系数得确定依据; e) The bases and rationalities for new process, new technique and new equipment;/新工艺、新技术、新设备采用得依据及合理性; f) The requirements for standardization of process technical documents;/工艺技术文件得标准化要求; g) The principles for determination and control of material consumption quota shall be reviewed、/审查材料消耗定额确

 定及控制得原则。

 5。4、2.2 Review of Key Article and Important Article/关键件、重要件得评审 a) The control factor s a nd c onte n ts of th e proces s documents on key processes (working processes) of key article and important article shall be reviewed for correctness, rationality and inspectability;/审查关键件、重要件中关键过程(工序)工艺文件得控制因素及内容得正确性、合理性、可检查性; b) The process capability index of key process (working process) shall be verified;/核实关键过程(工序)得工序能力指数; c) The process methods and detection requirements for key processes (working processes) of key article and important article shall be reviewed for rationality and feasibility;/审查关键件、重要件中关键过程(工序)得工艺方法、检测要求得合理性与可行性; d) The setup of associated working procedure and inspection process related to formation of quality characteristic of key process (working process) shall be reviewed for correctness, rationality and feasibility;/审查与关键过程(工序)得质量特性形成,涉及得关联工序及检验工序设置得正确性、合理性、可行性; e) The technical breakthrough measure for key process (working process) shall be reviewed;/审查关键过程(工序)得技术攻关措施; f) The content of key process (working process) shall be reviewed for pleteness。/审查关键过程(工序)目录得完整性。

 5、4、3。1 Technical Quality Department shall issue the review content or related data to the reviewing units。/技术质量部将评审内容或有关得资料送交各参评单位。

 5。4、4 Organization and Responsibility of Review/评审组织及职责 5、4。4、1 Review Organization/评审组织 The process review group shall be posed of reviewers of which the chief is competent technical leader or his/her representative。

 由参评人员组成工艺评审组,组长由主管技术领导或由她指定得委托人担任。

 5。4.4。2 Responsibilities of Review Group Chief/评审组长职责 a) Preside over the meeting;/主持会议; b) Collect the problems and suggestions put forward in the review, give opinions and make conclusions;/汇集评审提出得问题与建议,写出评语与结论; c) Assign a recorder to sort and work out the process review reports;/指定记录人员整理、写出工艺评审报告; 5、4、4、3 Responsibilities of Reviewer/评审人员职责 a) Ready for the review in advance;/提前做好参评准备; b) Give opinions fully./充分发表意见; 5、4、5 Review Steps/评审步骤 5、4.5。1 The review group chief shall describe the meeting and assign a recorder;/评审组组长作会议说明并指定记录人员; 5、4。5。2 The process design representative shall introduce the process design;/工艺设计代表介绍工艺设计情况; 5、4.5。3 The reviewers shall give the opinions on the review;/参评人员发表评审意见; 5。4.5.4 The review group chief shall define the items and contents to be improved on the basis of collected opinions, and summarize the review results to give his/her opinion or make a conclusion;/评审组组长在集中意见得基础上,明确需要改进得项目与改进内容,对评审结果总结形成评语或结论; 5、4。5、5 The recorder shall sort the meeting records and fill in Report on Process Design and Development Review、/记录人

 员整理会议记录,填写《工艺设计与开发评审报告》、 5、4。6 Measure Implementation and Data Perfection/落实措施,完善资料 Technical Quality Department shall earnestly analyze the problems and improvement opinions put forward in the review meeting, work out the measures, have them taken and perfect the process data。

 技术质量部认真分析评审会议提出得问题与改进意见,制定并落实措施,完善工艺资料、 5.5 First Article Inspection/首件鉴定 5.4.1 Technical Quality Department shall draw up a first article (batch) inspection plan, propose the inspection requirement, assign a person to arrange the trial-manufacture inspection and arrange the plant implementation on the basis of issued New Product Trial-manufacture Plan./技术质量部根据下达得新产品试制计划,拟订首件(批)鉴定计划,提出鉴定要求,明确试制鉴定组织人员,并组织实施。

 5.4、2 Trial—manufacture of First Article (Batch)/首件(批)试制 Manufacturing Department shall trial—manufacture the first article (batch) on the basis of New Product Trial—manufacture Plan and the following requirements: 制造部根据新产品试制计划与下列要求组织进行首件(批)试制: a) The process device, production equipment, test equipment, environmental condition, etc shall meet the provisions of process documents, and the ready condition of trial-manufacture shall be qualified through check;/工艺装置、生产设备、试验设备及环境条件等满足工艺文件得规定,并经试制准备状态检查合格; b) The article shall be processed in each working process strictly in accordance with the requirements of process document, and the problems found during the trial-manufacture in each working process shall be handled and recorded by the technician in time;/每道工序应严格按工艺

 文件得要求加工,技术人员及时处理、记录每道工序试制中得问题; c) The inspector shall check the processed article and make related records、/检验人员进行加工后得检测,做好相关记录、 5。4。3 Inspection for First Article (Batch) Working Process/首件(批)工序鉴定 5。4、3、1 The article (part or component) in first article (batch) working process shall be inspected strictly in accordance with issued process document and work instructions for trial-manufacture. After it is qualified, the condition on inspection for first article (batch) working process shall be possessed./首件(批)工序(零、部)件严格按照下发得试制工艺文件与作业指导书进行检验、合格后才能具备首件(批)工序鉴定条件。

 5.4。3、2 When the condition on inspection for first article (batch) working process shall be possessed, Manufacturing Department shall fill in “Application Form for Inspection (Type Approval) of First Article (Batch) Working Process” and submit it to Technical Quality Department to inspect the first article (batch) working process。/具备首件(批)工序鉴定条件时,由制造部填写“首件(批)工序(零、部)件鉴定(定型)申请表"交技术质量部门组织对首件(批)得工序实施鉴定。

 5.4、4 Inspection of Part and ponent in First Article (Batch) Working Process/首件(批)工序零、部件鉴定 5、4、4.1 Technology Quality Department shall take charge of assign the inspectors to inspect the part and component in the first article (batch) working process。/技术部门负责组织鉴定组成员,进行首件(批)零、部件鉴定、 5.4。4。2 The situation on the inspection for first article (batch) working process and the processing quality of the working process shall be spot checked, with the following contents verified:/抽查首件(批)工序鉴定情况及工序加工质量,验证以下

 内容: a) pleteness, correctness and effectiveness of procedure document and work instructions;/工艺文件、作业指导书得完整、正确、有效性; b) Configuration of measuring equipment like measuring tool and effectiveness of the equipment for product quality control;/量具等测量设备得配置及对产品质量控制得有效性; c) Conformance of processing in working process to process document;/工序加工与工艺文件得符合性; d) Qualities of raw material, parts and auxiliary equipment as well as blank;/原材料、配套件、坯件质量; e) Whether the precision of production equipment meets the processing requirement。/生产设备得精度能否满足加工要求。

 5。4。4。3 The finished part and component in the first article (batch) shall be spot checked to affirm whether they meet the requirements of the customer's production drawings./抽查首件(批)零、部件成品,证实其就是否满足客户产品图要求、 5、4。4.4 Inspection Group shall assess the result of spot check, make a conclusion and fill the conclusion and found problems in corresponding columns of Checklist of Parts/ponents in First Article (Batch) Working Process、/鉴定组对抽查结果进行评议,做出鉴定结论并将结论及问题写入《首件(批)工序(零、部)件鉴定表》相应栏内。

 5、4.5 Post-inspection Disposal/鉴定后得处置 5。4、5。1 The part and ponent qualified through the inspection shall be circulated or stored as required。/鉴定合格得零、部件按要求流转或保存。

 5。4.5、2 For the part and component unqualified through the inspection, the subsequent part and ponent can be used for re—inspection。/鉴定未通过时,允许用后续产品递补,重新进行鉴定。

 5.5

 Validation of Design and Development/设计与开发得验证 5.5.1 Based on the process design and development program passing through the review, Technical Quality Department shall be responsible for citing the affirmed evidence related to similar process design and development for parison as the basis for verification of this design./根据评审通过得工艺设计与开发方案,技术质量部负责引用已证实得类似工艺设计与开发得有关证据进行比较,作为本次设计得验证依据。

 5.5.2 The project leader shall summarize all the verification results, work out Report on Verification of Process Design and Development, record the verification results and traced measures and report them to Chief Engineer for approval so as to ensure that every performance indicator and every functional indicator in process design and development input have corresponding verification records、/项目负责人综合所有验证结果,编制《工艺设计与开发验证报告》,记录验证得结果及跟踪得措施,报总工程师批准,确保工艺设计与开发输入中每一项性能、功能指标都有相应得验证记录。

 5。6

 Confirmation of Design and Development/设计与开发得确认 The confirmation is intended to prove that the product meets expected use requirement, and should be carried out before batch production as usual。

 If the confirmation needs to be carried out after the product is used by the user for a period, it should be realized locally within possible applicable range。

 Based on the product characteristics, one of the following confirmation methods can be selected。

 确认得目得就是证明产品能够满足预期得使用要求 ,通常应在批量生产之前,如需经用户使用一段时间才能完成确认工作得,应在可能得适用范围内实现局部确认,根据产品得特点,可以选择下述几种确认方式之一。

 5。6。1 Technical Quality Department shall arrange related perso

 nnel to carry out the first article inspection for the product, i。e、, the product process design and development is confirmed;/技术质量部组织相关人员对产品进行首件鉴定,即对产品工艺设计与开发予以确认; 5、6。2 After the product is qualified through the acceptance, if it is delivered by Marketing Department to the customer for tryout, Marketing Department shall fill in Customer Satisfaction Questionnaire to indicate the customer satisfaction for conformance of product to standard or contract requirement and the assessment for applicability, the customer satisfaction refers to the confirmation of process design and development;/自验收合格得产品,如果需要由营销联系交付顾客试用,由营销部提交《顾客满意度度调查表》,说明顾客对产品符合标准或合同要求得满意程度及对适用性得评价,顾客满意即对工艺设计与开发予以确认; 5、6。3 The product shall be sent to national or industrial related agency for inspection, the report on qualification through inspection r efer s t o the confirmat i on of process de s i g n and development。

 The above report and related data are the results of the confirmation。

 Technical Quality Department shall analyze the results, take corresponding tracing and improvement measures as needed, fill them in Contact Form for Process Design and Development Information and submit the form to relevant departments for implementation to ensure that the product meets expected use requirements。/产品送到国家或行业有关机构进行检验,其检验合格报告即为工艺设计与开发得确认。上述报告及相关资料为确认得结果,技术质量部对此结果进行分析,根据需要采取相应得跟踪与改进措施,并填写在《工艺设计与开发信息联络单》上传递给相关部门执行,以确保产品满足预期得使用要求。

 5。7 Control of Changes in Design and Development/设计与开发更改得控制 5、7。1 The important changes of key article, important articl

 e and special process shall be carried out after test, demonstration and review。

 The review shall include evaluation on the effect of components and delivered products brought by these changes、/关键件、重要件与特种工艺得重要更改,应通过试验、论证、评审后实施。审核应包括构成零件与已交货产品得变动效果得评估 5、7、2 For the change after the formal process document is issued, Technical Quality Department shall fill in Application for Document Change with relevant data attached./正式工艺文件下发后得更改应由技术质量部填写《文件更改申请》,并附上相关资料、 5、7.3The process document shall be changed after approval of the Management Representative (if necessary, such change shall be reviewed by relevant departments and related personnel) and the information on the change shall be available to relevant departments, personnel and the supplier in time、 All modifications shall be identified and recorded for filing。/更改工艺文件必须报管理者代表批准后方可进行更改(必要时需要相关部门及相关人员进行评审),并确保相关部门、人员、及供应商及时得到更改信息。所有变动与修改应予以识别与归档。

 6 Relevant Documents/相关文件 6。1 TY-QP4。2-01—15Control Procedure for Document

 TY—QP4。2—01-15《文件控制程序》 6。2 TY-QP4。2—02-15 Control Procedure for Quality Record

  TY-QP4。2—02—15《质量记录控制程序》

 7 Annexes/附件 7.1 TY—QR-TQD-092 Application for Setup of Process Design and Development Project / TY—QR—TQD-092《工艺设计与开发立项申请书》

 7.2 TY-QR-TQD—093 Assignment Book for Process Design and Development TY—QR-TQD-093《工艺设计与开发任务书》

 7.3 TY—QR-TQD-094 Process Design and Development Plan

 TY-QR-TQD-094《工艺设计与开发计划书》

  7.4 TY-QR—TQD—095 Contact Form for Process Design and Development Information / TY-QR-TQD-095《工艺设计与开发信息联络单》

 7.5 TY-QR—TQD-096 List of Process Design and Development Inputs TY-QR—TQD-096《工艺设计与开发输入清单》

 7.6 TY-QR—TQD-097 List of Process Design and Development Outputs TY—QR—TQD—097《工艺设计与开发输出清单》

 7.7 TY—QR—TQD—098 Application Form for Inspection (Type Approval) of First Article (Batch) Working Process /

  TY-QR—TQD—098《首件(批)工序(零、部)件鉴定(定型)申请表》

 7.8 TY—QR-TQD-099 Checklist of Parts/Components in First Article (Batch) Working Process /

 TY-QR-TQD-099《首件(批)工序(零、部)件鉴定表》 7.9 TY-QR—TQD100 Report on Process Design and Development Review TY—QR—TQD100《工艺设计与开发评审报告》 7.10 TY-QR-TQD101 Report on Verification of Process Design and Development TY—QR—TQD101《工艺设计与开发验证报告》

 Application f or

 Setup of Pr oce ss Design an d Devel opm en t P roject 工艺设计与开发立项申请书

 LOG/SN 序号:

  TY—QR-TQD—092A Application Department/提出部门

 Applicant/申请人

 Project Name/项目名称

 Type and Specs/型号规格

 Sales Target/销售对象

 Date of Application/申请日期

 Basic Information (incl。

 performance, structure, appearance and package, technical parameter description, etc)/基本要求(包括主要性能、结构、外观包装、技术参数说明等) Market Forecast and Analysis (incl、 market demand, user"s expectation, situation on petitor, current situation on product quality, expected sales of first batch, delivery term, ex—factory price, etc)/市场预测分析(包括市场需求、用户期望、竞争对手情况、产品质量现状、预期首批销量、交货期限、出厂价格) Referable Existing Technique/可引用得原有技术 Feasibility Analysis (incl、 technique, purchase, process, cost, etc)/可行性分析(包括技术、采购、工艺、成本等方面) Approval of Department Leader/部门领导审批:

 Signed by/签名:

 Date/日期: Verification of Chief Engineer/总工程师审核: Signed by/签名:

 Date/日期:

 Written Instruction of General Manager/总经理批示:

 Signed by/签名:

 Date/日期: As signment Book f or

 P ro cess Design an d De velo pme nt/ 工艺设计与开发任务书

  LOG/SN 序号:

 TY—QR-TQD-093A Pr ocess

 Desi gn

 a nd Develo pmen t Pl an/ 工艺设计与开发计划书 Product Model/产品型号: Product Name/产品名称: Dates of Start and End of Product Development/产品开发起止日期: P r o ject Leader/项目负责人: Target Cost/目标成本: Applicable Standards or Laws and Regulations (incl. name, No。, revision, chapter/section No。, etc)/依据得标准或法律法规(包括名称、编号、版本、章节号等):

 Description of Product Function/产品功能描述:

 Technical Parameter and Performance Indicator/技术参数及性能指标:

 Requirement for Product Structure/产品结构要求:

 Special Requirement of Customer/顾客特殊要求: □ No/无 □ Yes, please describe/有,具体描述:

 Other Requirements/其它要求:

 Remarks/备注:

 Jointly Signed by/会签评审: Department/部门 Reviewed by/Date/评审人/日期 Title/职位 Department/部门 Reviewed by/Date/评审人/日期 Title/职位

  Prepared by/Date/ 编 制/日期

 V e rif i ed by/Date/审核/日期

 Appro v ed by/Date/批准/日期

 LOG/SN序号:

 TY—QR-TQD—094A Project Name/项目名称: Project Source/项目来源: Development Period/开发周期: General Project Leader/项目总负责人: Designer/设计人员 Title/职位 Designer/设计人员 Title/职位 D e signer/设计人员 Title/职位

  Resource Allocation/资源配置:

 Stage Division/Main Content/阶段划分及主要内容 Responsible Department/责任部门 Leader/责任人 Date of Completion/完成时间 D es i gn Development Input/设计开发输入 Preparation of Application for Setup of Project/编制立项申请书

 Review of Application for Setup of Project/对立项申请书进行评审

 D e s ign Development Output/设计开发输出 Design of Drawing, Process, Tooling and Fixtures/图纸、工艺、工装夹具设计

 Preliminary Technical Design Review/初步技术设计评审

 Technical Design Document Output/技术设计文件输出

 Sample Trial—manufacture/样品试制 Part Purchase/零部件采购

 Manufacture of Tooling and Fixtures/工装夹具制作

 Sample Trial-manufacture/样品试制

 Sample Test/样品检测

 D e velo pment Validation and Review/开发验证、评审 Sample Review/样品评审

 Project Summary/项目总结

 Project Review/项目评审

 Design Development Output/设计开发输出 Formal Drawing/正式图纸

 Formal Process Document/正式工艺文件

 Formal Work Instructions/正式作业指导书

 Conversion into Formal Production/转入正式生产

 Remarks/备注:

 Co ntact

 F orm

 for Process Desi ig n an d D evelopm ent Infor mation 工艺设计开与开发信息联络单 LOG/SN 序号:

 TY—QR—TQD—095A Prepared by/Date/编制/日期

 Veri f i e d by/Date/ 审 核 /日期

 Approved by/Date/批准/日期

 Content/内容:

 Signed by/签字:

 Date/日期 : Project Leader’s Opinion/项目主管意见 Related Leader's Opinion/相关领导意见

 Lis t

 o f Pr ocess

 De sign and Develo pment

 I nputs /工艺设计与开发输入清单 LOG/SN 序号:

 TY-QR-TQD-096A

 Signed by/签字:

 Date/日期:

  Signed by/签字:

 Date/日期: SN/序号 Name/名称 Unit/单位 Qty/数量 Remarks/备注

 Prepared by/编制:

 Verified by/审核:

  Approved by/批准: Date/日期:

  Date/日期:

 Date/日期: List

 o f Pro cess Des ig n

 a nd De velo pment Outputs/ 工艺设计与开发输出清单

 LOG/SN 序号:

 TY-QR-TQD—097A SN/序号 Name/名称 Unit/单位 Qty/数量 Remarks/备注

  Prepared by/编制:

 Verified by/审核:

 Approved by/批准: Date/日期:

  Date/日期:

  Approved by/批准: Applicat ion Form fo r In spect ion

 ( Ty pe App roval) of First

 A rticle (Bat tch) Work ing

 Pr ocess/ 首件( 批) 工序( 零、部) 件鉴定( 定型) 申请表 LOG/SN 序号:

 TY-QR-TQD—098A SN/序号 Product Name/产品名称 Working Process/工序名称 Pro d uct Status/产品状态 Remarks/备注

 Application Department/申请部门

 Applicant/申请人

 Date of Application/申请时间

 Che ckli st of

 P arts/Co mponen ts in Fir st Arti cle ( Batch) Working Process 首件( 批) 工序( 零、部) 件鉴定表 LOG/SN序号:

  TY-QR—TQD-099A Manufacturing Department"s Opinion/制造部意见:

 Signed by/签字:

  Date/日期: Technical Quality Department’s Opinion/技术质量部意见:

 Signed by/签字:

 Date/日期: Product Name/产品名称 Drawing No、/图号 No、 of Part/Component in First Article (Batch)/首件(批)(零部)件编号

 Item/项目 SN/序号 Inspection Content/鉴定内容 Inspection Result/鉴定结果 Remarks/备注 Process Quality/过程质量 Product Quality/产品质量 1 Completeness, Correctness and Effectiveness of Procedure and Work Instructions/工艺文件、作业指导书得完整、正确、有效性

  2 Configuration of Measurement Equipments like Gauges and Their Effectiveness for Control of Product Quality/量具等测量设备得配置及对产品质量控制得有效性

  3 Whether the Precisions of Tooling and Production Equipments Meet the Processing Requirements/工装、生产设备得精度能否满足加工要求

  4 Implementation of Process by

 R Re por t on P roc ess De si gn and D eve lopment

 Re view/ 工艺设计与开发评审报告 LOG/SN 序号:

  TY-QR—TQD-100A Manufacturing Department/制造部工艺执行情况 5 Whether the Production Conditions are Controlled/生产条件就是否处于受控状态

  6 Whether the Product Quality Accords to the Requirements of the Customer's Drawings/产品质量就是否符合客户图纸要求

  Inspection Conclusion/鉴定结论

 Jointly Signed by Members/组员会签 Signed by/签字:

 Date/日期: Chief Engineer's Opinion/总工程师意见 Signed by/签字:

 Date/日期: General Manager’s Opinion/总经理意见 Signed by/签字:

 Date/日期: Product Model/产品型号: Product Name/产品名称: Review Category/评审类别:□ Preliminary Design Review/初步设计评审 □ Process Program Review/工艺方案评审 □ Others/其她: Review Moderator/评审主持人: Date of Review/评审时间: Object/评审对象:

 Content/评审内容:Ticking in □ expresses passing through the review and filling "?" in □ expresses the suggestion or doubt/□内打“√”表示通过评审,打“?" 表示有建议或疑问、 Process Program Review/工艺方案评审 1。Economy/经济性□

 2。Rationality of Process Flow/工艺流程合理性□

 3.Rationality of Test Method/检测方法合理性□

 4、Rationality of Quality Control Point Placement/质控点设置合理性□ 5、Working Process Capability/工序能力□

 6.Rationality of Equipment Selection/设备选型合理性□

 7。Feasibility of Purchasing Outsourced Article/采购外协可行性□

 8、Feasibility of Tooling Des

 R eport on Vali da tio n of Proc es s Des ign and De vel opment /工艺设计与开发验证报告 LOG/SN 序号:

 TY—QR-TQD-101A ign/工装设计可行性□ 9。

 Problems and Suggestions (for contents not passing through the review)/存在问题及改进得建议(与评审没通过得内容对应):

 Review Conclusion/评审结论:

 Signatures of Reviewers/评审人签名: Department/ 部门 Reviewed by/Date/评审人/日期 Title/职位 Department/部门 Reviewed by/Date/评审人/日期 Title/ 职位

  Pre p a r e d by/Date/ 编 制 / 日期

 Verifi ed by/Date/审核/日期

 Appr o v ed b y/Date/ 批 准/日期

 Validation of Improvement Measures Proposed in Review Conclusion/评审结论中改进措施得验证情况: Validated by/验证人:

 Date/验证时间:

  Product Model/产品型号: Product Name/产品名称: Validation Unit/验证单位 Tested Sample No./测试样品编号: Times of Start and End of Test/试验起止时间: Applicable Standards or Laws and Regulations/依据得标准或法律法规: S N/ 序号 No. and Rev、/编号、版本 Names of Standards or Laws and Regulations/标准或法律法规名称 Applicable Chapters/Sections/适用章节

  Main Test Instruments and Equipments/主要试验仪器及设备: SN / 序 Nos、 of Ins Names of Instruments and Equipm Period of Validity fo

  号 truments and Equipments/仪器设备编号 ents/仪器及设备名称 r Measurement/计量有效期

  Abstract of Test/Inspection Report and Comparison of the Report with Design Input (Technical Design Specifications)/Standards/试验/检测报告内容摘要及其与设计输入(设计技术任务书)/标准得对照情况: S N/ 序号 Test Items/检测项目 Actual Test Values/实际检测值 Required Values in De s ign Input/ S t andards/设计输入/标准得要求值 Conclusion/结论

  Design Validation Summary/设计验证总结论: Prepared by/Date/编制/日期: Verified by/Date/审核/日期: Approved by/Date/批准/日...

推荐访问:控制程序 工艺 开发

最新推荐New Ranking

1幼儿园中班六一活动方案

温暖的阳光,诱人的花香,激动的脸庞,六一国际儿童节在小朋友和老师的热烈期盼中来到了我们的身旁。...

2某市医疗保障工作要点

2022年是党的二十大召开之年,也是医保助力共同富裕的奋进之年。2022年全市医疗保障工作的总体要求是...

3区委书记在市委招商专题汇报会上讲话提纲

今年来,XX区积极响应中央、省、市号召,立足当前经济形势,抢抓发展机遇,充分挖掘中心城区区位优势...

4在局推进基层正风反腐工作会议上讲话

同志们:今天召开这次会议主要是贯彻落实3月24日我区基层正风反腐专项治理工作会议精神,部署开展我局...

5农村“五治”工作实施方案

为深入学习贯彻XXX关于实施乡村振兴战略重要讲话精神,打赢改善农村人居环境这场硬仗,践行为民宗旨、厚...

6在市政协五届一次会议开幕会上讲话

市政协四届一次会议以来的五年,是XX砥砺前行、克难攻坚的五年,也是拼搏进取、满载荣光的五年。五年...

7市全面推行证明事项告知承诺制工作实施方案

为进一步深化“放管服”改革,深入开展“减证便民”行动,优化营商环境,激发市场主体活力和社会创造...

8党课讲稿:意识形态领域形势何以发生全局性根本性转变

党的十九届六中全会通过的《中共中央关于党的百年奋斗重大成就和历史经验的决议》(以下简称《决议》...

9研讨发言:科技创新引领,构建现代产业体系(集团公司董事长,党委书记)

中央经济工作会议把“强化国家战略科技力量”“增强产业链供应链自主可控能力”提到了前所未有的战略...

10在全省药品监管工作会议上经验交流发言

2021年,全市市场监管系统在省药监局和市委、市政府的正确领导下,坚持以XXX“四个最严”为指导,聚焦...